In September of 2008, we broke ground on the 18-feet-wide residential lot on Warren Park in Chicago. The home is 12.5 feet wide, 70 feet long, and is intended to be an exemplary model for building both 'green' and cost-effectively. A multi-level design responds to the narrow lot, in order to maximize both space and views of the park. Design by Sandberg Architecture and Design - http://sandbergarchitecture.com

Wednesday, December 31, 2008

Geothermal


Posted by Sandberg at 11:58 AM No comments:
Labels: Drilling for geothermal - the equipment was able to go down roughly 90 feet before it hit a layer of sizable rocks. So, we'll now need seven holes instead of the four at 150 feet deep we planned.

Monday, December 29, 2008

Rear facade of house


Posted by Sandberg at 11:45 AM No comments:
Labels: Sliding doors at 1st floor kitchen and 2nd floor master bedroom, with geothermal drill in foreground

Stairs


Posted by Sandberg at 11:43 AM No comments:
Labels: Completion of the last flight of stairs - to the girls' bedrooms

Master Bedroom




Posted by Sandberg at 11:38 AM No comments:
Labels: Stefan and Henry putting in the Master Bedroom sliding door

Roof










Posted by Sandberg at 11:32 AM No comments:
Labels: The white TPO membrane roof was completed a couple weeks ago - thankfully right before one of the big storms

Sunday, December 28, 2008

Window installation







Posted by Sandberg at 11:24 AM No comments:
Labels: Exterior view and two view out Kitchen/Dining windows

Saturday, December 20, 2008

Plumbing Begins


Posted by Sandberg at 11:14 AM No comments:
Labels: Plumbing with family in sub-zero temps the weekend before Christmas

Thursday, December 11, 2008

Interior Framing


Posted by Sandberg at 11:11 AM No comments:
Labels: Carpenter Alan Stauton - framing the center core and stair of the house

Thursday, December 4, 2008

Interior view


Posted by Sandberg at 7:36 PM No comments:
Labels: Center of building, prior to 'core' and stair construction

View of west facade


Posted by Sandberg at 7:28 PM No comments:

View from Northeast


Posted by Sandberg at 7:26 PM No comments:
Labels: Exterior framing complete
Newer Posts Older Posts Home
Subscribe to: Posts (Atom)

Followers

Blog Archive

  • ►  2010 (3)
    • ►  February (3)
  • ►  2009 (37)
    • ►  November (2)
    • ►  October (5)
    • ►  September (12)
    • ►  June (3)
    • ►  May (8)
    • ►  March (5)
    • ►  February (1)
    • ►  January (1)
  • ▼  2008 (29)
    • ▼  December (11)
      • Geothermal
      • Rear facade of house
      • Stairs
      • Master Bedroom
      • Roof
      • Window installation
      • Plumbing Begins
      • Interior Framing
      • Interior view
      • View of west facade
      • View from Northeast
    • ►  November (13)
    • ►  October (1)
    • ►  September (4)

About Me

Sandberg
View my complete profile