In September of 2008, we broke ground on the 18-feet-wide residential lot on Warren Park in Chicago. The home is 12.5 feet wide, 70 feet long, and is intended to be an exemplary model for building both 'green' and cost-effectively. A multi-level design responds to the narrow lot, in order to maximize both space and views of the park. Design by Sandberg Architecture and Design - http://sandbergarchitecture.com

Monday, November 2, 2009

Exterior




Posted by Sandberg at 7:45 PM 6 comments:

Entrance canopy




Posted by Sandberg at 7:43 PM No comments:
Labels: Cedar wood installation at underside of canopy

Friday, October 30, 2009

Kitchen







Posted by Sandberg at 6:18 AM 2 comments:

Stair - up to bedrooms


Posted by Sandberg at 6:17 AM 1 comment:
Labels: Wood risers and recycled rubber treads

Hallway outside bedrooms


Posted by Sandberg at 6:15 AM No comments:

Bathroom


Posted by Sandberg at 6:10 AM No comments:
Labels: Skylight complete - close to move-in condition

Fall
















Posted by Sandberg at 6:00 AM 1 comment:
Labels: and girls' bedroom, guest bedroom, master bedroom and porch, View of changing leaves out windows (from top to bottom): living room

Tuesday, September 22, 2009

Wood floors installed




Posted by Sandberg at 7:47 PM No comments:
Labels: Reclaimed white oak - salvaged locally from old shoreline piers excavated during recent high rise construction west of Navy Pier

Porch


Posted by Sandberg at 7:45 PM No comments:

Wednesday, September 2, 2009

Porch


Posted by Sandberg at 9:01 PM 1 comment:
Labels: during construction, off of Master bedroom, View from 2nd story porch

Siding and porch construction


Posted by Sandberg at 9:01 PM No comments:

Siding




Posted by Sandberg at 9:00 PM No comments:

Siding installation


Posted by Sandberg at 8:52 PM No comments:
Labels: After long delivery delays from Hardie, the shipment finally arrived but was the wrong product - A month later, we had the right stuff and were glad to have the installation begin.

Carpet


Posted by Sandberg at 8:51 PM No comments:
Labels: ...and Claire

Carpet




Posted by Sandberg at 8:48 PM No comments:
Labels: Recycled nylon carpet 'Flor' tiles from Interface - the kids have already made themselves at home on their visits to the site

Master bathroom


Posted by Sandberg at 8:47 PM No comments:
Labels: and stone mosaic floor tile, Porcelain wall tile at custom shower

Bathroom


Posted by Sandberg at 8:45 PM 1 comment:
Labels: Stone mosaic tile and dual-flush toilet

Powder Room


Posted by Sandberg at 8:43 PM No comments:
Labels: Dual flush toilet, lav base built from salvaged lumber from home construction

Green Sign



Posted by Sandberg at 8:09 PM No comments:
Labels: Sign recognizing the project's involvement with the City's green building program

Saturday, June 27, 2009

Tile and plumbing


Posted by Sandberg at 10:10 AM 2 comments:
Labels: Bathtub installed and tile began in one of the bathrooms

Drywall install




Posted by Sandberg at 10:08 AM No comments:

Housewrap


Posted by Sandberg at 10:04 AM No comments:

Thursday, May 28, 2009

Cellulose insulation install


Posted by Sandberg at 10:02 AM No comments:
Labels: Recycled newspaper cellulose insulation

Monday, May 18, 2009

Temporarily pink


Posted by Sandberg at 9:49 AM 1 comment:
Labels: Rigid fiberglass insulation and wood furring strips for siding attachment

Sunday, May 10, 2009

The final window was installed & exterior insulation began


Posted by Sandberg at 3:03 PM No comments:

View from living room side window


Posted by Sandberg at 3:03 PM No comments:

View from living room front window


Posted by Sandberg at 3:01 PM No comments:

View from master bedroom porch doors


Posted by Sandberg at 3:00 PM No comments:

View from side bedroom window


Posted by Sandberg at 3:00 PM No comments:

Saturday, May 9, 2009

View from front bedroom window


Posted by Sandberg at 3:25 PM No comments:

Saturday, March 21, 2009

Garage Door


Posted by Sandberg at 12:28 PM No comments:
Labels: Garage Door installed - material matches the exterior window cladding: clear-anodized aluminum.

Friday, March 20, 2009

Electricity


Posted by Sandberg at 7:47 PM No comments:
Labels: ComEd provided a new pole to allow the power grid to reach the house (since the lot is at the end of the street and was previously unbuilt) - the pole was set and electricity finally arrived today.

Thursday, March 19, 2009

Completing the geothermal pipe system


Posted by Sandberg at 8:37 PM No comments:
Labels: Trenches were dug this week to bury and tie together the geothermal piping below frost levels.

Ready for City Inspections


Posted by Sandberg at 8:32 PM No comments:
Labels: View of Kitchen with mechanical/electrical/plumbing 'rough' work complete and ready for inspection prior to insulation and drywall.

Interior View


Posted by Sandberg at 8:25 PM No comments:
Labels: View of stair up to bedrooms from living room, with picture window overlooking park on the right and interior window on the left.

Tuesday, February 24, 2009

Entrance canopy


Posted by Sandberg at 8:41 PM No comments:
Labels: Structure for the entrance canopy was installed prior to the final (corrected) window delivery.

Saturday, January 17, 2009

Ceiling Framing


Posted by Sandberg at 11:06 AM No comments:
Labels: Doug's brother Mark helping with miscellaneous framing - like dropping the ceiling in the Kitchen to conceal plumbing and HVAC ductwork.
Newer Posts Older Posts Home
Subscribe to: Posts (Atom)

Followers

Blog Archive

  • ►  2010 (3)
    • ►  February (3)
  • ▼  2009 (37)
    • ▼  November (2)
      • Exterior
      • Entrance canopy
    • ►  October (5)
      • Kitchen
      • Stair - up to bedrooms
      • Hallway outside bedrooms
      • Bathroom
      • Fall
    • ►  September (12)
      • Wood floors installed
      • Porch
      • Porch
      • Siding and porch construction
      • Siding
      • Siding installation
      • Carpet
      • Carpet
      • Master bathroom
      • Bathroom
      • Powder Room
      • Green Sign
    • ►  June (3)
      • Tile and plumbing
      • Drywall install
      • Housewrap
    • ►  May (8)
      • Cellulose insulation install
      • Temporarily pink
      • The final window was installed & exterior insulati...
      • View from living room side window
      • View from living room front window
      • View from master bedroom porch doors
      • View from side bedroom window
      • View from front bedroom window
    • ►  March (5)
      • Garage Door
      • Electricity
      • Completing the geothermal pipe system
      • Ready for City Inspections
      • Interior View
    • ►  February (1)
      • Entrance canopy
    • ►  January (1)
      • Ceiling Framing
  • ►  2008 (29)
    • ►  December (11)
    • ►  November (13)
    • ►  October (1)
    • ►  September (4)

About Me

Sandberg
View my complete profile